Newsletter Archive

Below is an archive of our previous e-newsletters.

Please be aware that some links may have been updated or even deleted from some of the older newsletters.



Newsletter Date: Subjects:Link:



October 2021:Tailings White Papers, GDS Wins Company of the Year, View
May 2021:New EMDCSS-Confined, New 128 & 256kN Load Frames, Vale Laboratory OpeningView
February 2021:Preparing a Sand Sample, Structural Soils Lab Expansion, Software updatesView



December 2020:Tech Support Videos, Software Updates, Sample Failure Time LapseView
October 2020:Remote Installations, Installation Videos, 86% of Top UniversitiesView
July 2020:Technical Note in GE, Office Expansion, Dynamic Pressure ControlView
February 2020:New Brochure, Portable Laboratory, GDS Turns 40, Training & InstallationsView



Q3 2019:Instrumented Hoek Cell, Top 50 Universities, Recent InstallationsView
Q2 2019:GDS apparatus at NGI, 2019 Offshore Conference, Corporate VideoView
Q1 2019:Case Study: Wenzhou University, Installation of Dynamic Apparatus in High Risk Earthquake Region, 250kN Lifting frame cell lift.
View



December 2018:
High Speed Data Acquisition, EMDCSS, Advanced Controller for Corrosive FluidView
September 2018:
10kN Load Frame, Agents Conference, Careers at GDS.View
August 2018:
Customer Open Days, Case Study: Northwestern UniversityView
February 2018:Temperature Controlled CRS, GeotechniqueView
January 2018:Case Study: GEOTEKO, GDSVIS, View



December 2017:Video: Temperature Control, Case Study: GEOTEKOView
August 2017:Top 50 Universities, Case Study: Riga Technical UniversityView
April / May 2017:Stress Dependant Soil Water Characteristic Curve, White PapersView
March 2017:Choosing the Right Transducer, Videos: DYNTTS, LADS, Hydraulic Load FramesView
February 2017:Resonant Column Video, EMDCSS Video Part 2View
January 2017:Case Study: Variable Direction Cyclic Simple Shear, Video: Dynamic Simple ShearView



December 2016:Holiday Opening Times, Popular news articles from 2016View
November 2016:Video: Multi-directional Dynamic Cyclic Simple Shear, Case Study: Gas HydrateView
October 2016:Case Study Hollow Cylinder and new Hydraulic Load Frame RangeView
July 2016:
Case Study Temp Control, Currencies Fluctuations & Rock Mechanics BrochureView
May 2016:Dynamic Back Pressure Shearbox Case Study & Video: Acoustic EmissionsView
March 2016:Unsaturated Triaxial Testing Case Study, Bender Elements Analysis ToolView
February 2016:Shear Testing Comparison, Ring Shear Tester Launched, Career OpportunitiesView
January 2016:38th Year of business, interface shear tester case study & career opportunitiesView



December 2015:Holiday opening times, acoustic emissions testing, temperature controlled systemsView
November 2015: First hardin type resonant column, customer survey results & rock testing brochureView
October 2015: Oedometer CRS & UCS testing, product feature & seminar on soil & rockView
September 2015: 2016 product catalogue, upgrading existing apparatus case study & applicationsView
August 2015: Customer open day, XVI ECSMGE Edinburgh & Armfield partnershipView
June 2015:
2MN active cell, large automated direct shear system & website refreshView 
May 2015: New Multi-directional shear apparatus, new resilient modulus & hardin type systemView 
April 2015:Comparison of toyoura sand cyclic strength, job opportunity & customer open day
View
March 2015:Vacuum mould for dynamic shear, customer open day & advanced transducersView
February 2015:Advanced transducers & control, exhibition schedule & career opportunityView
January 2015:Monash case studies, shear & environmental testing video & career opportunityView



December 2014:Christmas Opening times & a selection of popular articlesView
November 2014:
1MN static loadframe, charity events & YouTube videosView
October 2014:
Test standard descriptions, oedometer automation article & exhibition scheduleView
September 2014:
Gas hydrate testing, frozen soil testing & exhibition scheduleView
August 2014:
SGS Invest in GDS apparatus, the role of shear testing & exhibition scheduleView
July 2014:
Product applications, 42% reduction in test duration & adaptive control firmwareView
June 2014:
Adaptive Control, job opportunities & exhibition scheduleView
May 2014:
Automating existing apparatus, transducers & accessories & 20 year old controllersView
April 2014:
GDS sell 50th Resonant Column, white paper on dynamic testing & LinkedIn articleView
March 2014:
White paper on dynamic testing, case study on Hollow Cylinder & exhibition scheduleView